Traffic Improvements

Our beautiful town of Boerne consistently receives honors on “Top Places to Live” lists as an ideal destination for families, retirees and businesses. As a result, the rapid rate of growth in residential, commercial and mixed-use development has resulted in the need for considerable traffic improvements. We visited with Kendall County and TxDOT to learn what’s in store for our roadways.

traffic

I-10 CORRIDOR

 

Area: I-10 at Dominion Drive to Ralph Fair Road/FM 3351

Scope of Project – Phase One:

• Converting existing two-way frontage roads between Boerne Stage Road and Ralph Fair Road to one-way

• Replacing overpass at Ralph Fair Road

• Reconfiguring entrance and exit ramps

• Intersection improvements at Ralph Fair Road

• Turnarounds at Ralph Fair Road

• Sidewalks and wide shared lanes for bicycles

Construction Dates:

Begin Summer 2013, End Summer 2015

 

Scope of Project – Phase Two:

• Converting existing two-way frontage roads between Dominion Drive and Ralph Fair Road to one-way

• Adding new turnarounds at Boerne Stage Road and Dominion Drive

• Operational improvements at Boerne Stage Road and necessary construction of ramp reconfigurations

Construction Dates:

Begin Fall 2014, End Summer 2016

 

Area: I-10 between Ralph Fair Road/FM 3351 and Fair Oaks Parkway

Scope of Project – Phase One:

• Converting existing two-way frontage roads to one-way

• Constructing a new I-10 overpass at Old Fredericksburg Road/Buckskin and adding four new ramps

• Reconfiguring entrance and exit ramps

Construction Dates:

Begin Late 2015, End 2018

 

Scope of Project – Phase Two:

• Constructing a new 5-lane bridge at Fair Oaks Parkway

Construction Dates:

Begin Late 2016, End Early 2018

 

Area: I-10 at Scenic Loop Road

Scope of Project:

• Reconstructing main lanes and overpass bridges

• Widening all approaches for improved operations

Construction Dates:

Begin Early 2016, End 2018

 

Area: I-10 West SH46/Bandera Road

Scope of Project:

• Construction of I-10 frontage road between SH46/Bandera Road and Christus Parkway

• Reconfiguring entrance ramps

• Intersection improvements at SH46/Bandera Road

Construction Dates:

Begin Spring 2015, End Fall 2015

 

Area: I-10 Managed Lanes between

Ralph Fair Road/FM3351 and La Cantera Parkway

A managed lane operates separately from the general purpose mainlanes and incorporates a combination of pricing strategies, vehicle eligibility and access control. The managed lanes will be added to approximately 5.7 miles of the I-10 corridor. The number of existing general purpose lanes will remain, and the use of managed lanes will involve a choice: utilized free of charge by mass transit, military, emergency responders and registered vanpools – all others would pay a toll.

Scope of Project:

• Expanding I-10 to a total of eight lanes (four in each direction)

• The additional four lanes would be managed lanes (two in each direction)

• Constructing entry and exit access points in each direction in the vicinity of Dominion Drive

• Existing general purpose (non-toll) lanes will remain

Construction Dates:

Begin Late 2016 to Early 2017, End 2020

 

BOERNE

 

Area: Herff Road

Scope of Project – Phase One/Widening Project:

• Constructing two southbound lanes and two northbound lanes with a center median between SH46/River Road and Old San Antonio Road

• Constructing a new bridge over Cibolo Creek to provide for the two northbound lanes

Construction Dates:

Begin December 2014, End Summer 2015

 

Scope of Project – Phase Two/Extension Project:

• Constructing two southbound lanes and two northbound lanes with a center median between Old San Antonio Road and US Business 87/South Main Street (between Wal-Mart and Dog & Pony Grill)

• Constructing a new bridge over Menger Creek for both southbound and northbound lanes

Construction Dates: Pending

 

Area: SH46/River Road at Plant Avenue – Pedestrian Safety Improvements

Scope of Project:

• Construction of new crosswalk, curb extensions and illumination

• Proposed construction of Rectangular Rapid Flashing Beacons (RRFBs) and Pedestrian Hybrid (HAWK) Signals

Construction Dates: Pending

 

Area: US Business 87 and SH46 

Pavement Improvements

Scope of Project:

• SH46 from US Business 87 to Boerne City Park

• SH46 from I-10 to US Business 87

• US Business 87 from I-10 North to South

Construction Dates: Pending

You Might Also Enjoy....

Cordillera Ranch POA

Continuing Improvement

By: Gary Short, Director of Real Estate Sales Each year the CR Realty office puts together a Cordillera Ranch-wide report on the overall real estate

Read More »
Staff Profile

Nick Madden

Head Golf Professional    405.397.8227  nmadden@cordilleraranch.com       Hometown: Yukon, Oklahoma   Family Members: Wife – Teigan What past work history prepared you for Cordillera

Read More »